GONZALO CASTRO received permit for street improvement excavation
Street use permit details
| Location | 810 Battery St |
|---|---|
| Approval date | October 24, 2003 |
| Permit number | 03IE-271 |
| Permit type | Street Improvement Excavation |
| Agent | Gonzalo Castro |
| Purpose | Reconstruct new curb/gutter and sidewalk to City Standards. Install three (3) new curb ramps. Saw-cut 2' of AC gutter and replace with 2" ACWS on 8" concrete base as directed by the BSM inspector. |
Added to EveryBlock on February 24, 2008.